Our Recent Projects
Explore the latest projects we've developed, showcasing our commitment to innovation and excellence in execution.






Project: Painting an entire condominium after being sanitized by a third-party company, we use a high-quality product along with a mold additive to achieve an excellent finish
Project: painting a two-story condominium with high-quality materials; areas covered include the ceiling, baseboards, walls, and handrails.
Project: this property hasn't been painted in over a decade; we had to use a pressure washer to remove the old peeling paint, and we applied top-quality sealer along with premium products for a smooth finish.


Project: we did the whole exterior of this project, we did pressure washer we applied top sealer and top quality products, areas painted: walls, soffits, gutters and a 25ft tall chimney
PAINT JOBS
HANDYMAN JOBS










This project involves removing the existing carpet and preparing the subfloor for a new finish. An 18x18 ceramic tile will be installed throughout the designated area, ensuring proper alignment and adhesion. The old baseboards will be removed and replaced with ceramic tile baseboards to provide a clean, durable, and updated finish.
This property had a downspout discharging directly under the driveway, which caused the concrete to deteriorate and become hollow. To correct the issue, we installed a proper drainage system and replaced a 16x26 ft section of concrete to restore structural integrity and provide a clean, durable finish.
This rental property had water intrusion due to an old curtain, which also caused damage to the existing vanity. To resolve the issue and provide a proper waterproof solution, we replaced the setup and installed a new sliding glass door, ensuring a clean, functional, and updated finish
This project involved expanding the existing concrete pad in an area with limited access. The new section was properly formed and poured using concrete bags, ensuring a solid and uniform extension despite the site constraints.
This project involved preparing the subfloor by removing loose and peeling paint to ensure proper adhesion. Once the surface was cleaned and stabilized, new 24x12 ceramic tile was installed to provide a durable, updated, and uniform finish.

Projects
Explore our recent projects showcasing innovative solutions and creativity.
The recent projects showcased here truly reflect the quality and creativity of your work. Impressive results!
John Doe
I was amazed by the innovative designs and execution of the projects. Highly recommend their services!
Jane Smith
★★★★★
★★★★★
Get in Touch with Us
We welcome your inquiries about our recent projects. Reach out to discuss collaborations or any questions you may have about our work.
Contact
1234567890x
Support
info@projectlink.com
